When it came time to expand, HGMG Transload, LLC engaged Stout & Caldwell to provide comprehensive civil engineering, surveying and environmental services for the development of a new heavy industrial 125,585 square foot warehouse. The Lester Fellows Trucking Company also was adding a 30,000 addition in the rear of the 43-acre site located at 1800 Beverly Road in Burlington Township, NJ. Led by firm partner Robert R. Stout, PE, CME, LS, the six-person team created conceptual and major site plans as well as conducted a variety of surveys, including boundary, topography, ALTA, utilities and highway, for use in the permitting process. The scope also required a Phase I Environment plus wetlands delineation with LOI, storm water design and soil testing. Working with project partners, Shropshire Traffic Engineering and Conrail, the firm provided traffic engineering, auto-turn analysis and a rail line spur addition. READ MORE
HGMG Transload, LLC / A Lester Fellows Trucking Co. - New Heavy Industrial Warehouse Development
1800 Beverly Road
Burlington Township, New Jersey
Project Details
Site Size 43 Acres
Buidling Size 125,585 SF Building + 30,000 SF Addition
Project Services: Conceptual and Major Site Plan, Boundary & Topographic Surveys, ALTA Survey, Utilities & Highway Surveys, Construction Stakeout & AutoCAD Services, Phase I Environmental, Storm Water Design and Management, Soil Testing and Analysis, Wetlands Delineation with LOI, Flood Zone Classification, Traffic Engineering & Auto-Turn Analysis, Parking Lot & Landscape Design, Rail Line Spur Addition with Conrail, Planning Board Testimony
Community impact
- Develop new heavy industrial fully-utilized warehouse
- Expand existing business within the region
- Increase taxable income within the county
- Create more than 40 new job opportunities